mosh
12-05-2008, 09:00 AM
All,
I have a table that has dates in three fields. The problem is, when I imported them, it was done as a text format. The format is xx.xx.xxxx, I want it to be a short date; i.e. 01/01/2008.
I have tried converting it through the table design view, but it says not enough memory. How can I go about updated this field?
Thanks.
________
Water bong (http://glassbongs.org/)
I have a table that has dates in three fields. The problem is, when I imported them, it was done as a text format. The format is xx.xx.xxxx, I want it to be a short date; i.e. 01/01/2008.
I have tried converting it through the table design view, but it says not enough memory. How can I go about updated this field?
Thanks.
________
Water bong (http://glassbongs.org/)