I am trying to calculate a due date for my equipment. I am creating a table right now and I have a field that is the last date of certification. I also have a field that has the number of months till the equipment needs recertification. I am having trouble getting the field for the due date to calculate.
I am not even sure if it can be done while in the table design.
Thanks.
I am not even sure if it can be done while in the table design.
Thanks.