Hi everyone!
I have a database that tracks the risk scores (NBScore) of projects being introduced into the system. The risk score is on a scale from 1-9. What I need to do is generate a report that shows the number of low risk(1-3), medium risk (4-6), high risk (7-9), and unknown score (NULL)...