Hello,
I have two tables in my database.
The first one is chronologically structured as follows:
MaterialID
PlannedProductionDate
PlannedProductionQuantity
255
27.12.2021
192
255
04.01.2022
192
300
15.01.2022
94
300
12.04.2022
188
300
19.04.2022
94
87
19.06.2022...