Search results

  1. R

    Query with time range across multiple days.

    Unfortunately there is no CDATE or ROUND in Access 2.0. Maybe I'm hooped?
  2. R

    Query with time range across multiple days.

    Access 2.0 says "Undefined function "Round" in expression". I think I see where you're going with this. As you can see, second accuracy however is all that's needed and that why you're rounding. Can you just cut off (ignore) the 10ths of seconds instead of rounding up? BY the way, how did...
  3. R

    Query with time range across multiple days.

    Here it is. It's the BAVARD query that I'm working on. It won't import into my Access 2007 so I working on it inside a W2k VM running Access 2.0 Maybe you can open it? Here is a heads up on how the report is being generated: Report FORM - DATE DEFAUT ANCIEN opens (on open) Function...
  4. R

    Query with time range across multiple days.

    You can see from my original post the original criteria that worked, but not the way I wanted it to. Here's the criteria I was playing with that have hard dates and time that don't work either. I get a blank query. date criteria: >=#7/12/2010# And <=#7/13/2010# time criteria: >=#6:00:00 AM#...
  5. R

    Query with time range across multiple days.

    G81: Was thinking myself that a sub-query might be the best answer although joining the fields was something I wondered about too. I'm not a db guru; I'm an industrial PLC programmer so this is not my forte. lagbolt: valid comments about the architecture but it's what I have to work with as I...
  6. R

    Query with time range across multiple days.

    My first post! Glad to have found such an exceptional forum. I am trying to figure out how to get a query that was designed to show data from 1 or more days from time 1 to time 2 to show data from date 1, time 1 to date 2, time 2 and I'm stumped. I got as far as getting day 1, time 1 to day...
Back
Top Bottom