I have two cells formated to TIME 1:30 PM.
I have a column that has start times. Another with finish times.
A1 = Start
B1 = Finish
My natural thought is =a1-b1 would give me my total time for the day.
Wrong I am.
What do I need to do?
Bob
I have a column that has start times. Another with finish times.
A1 = Start
B1 = Finish
My natural thought is =a1-b1 would give me my total time for the day.
Wrong I am.
What do I need to do?
Bob