hazeleyre23
Registered User.
- Local time
- Today, 04:27
- Joined
- Apr 6, 2016
- Messages
- 18
Hi,
I have a date controls (Date Entered) which is manually entered in Access, however I have another date controls (Date Chased) in which I want this controls to automatically populate with +2 working (Monday - Friday) days from Date Entered. Therefore If the date happens to be a Friday on the Date Entered control , I want Date Chased control to show Mondays date.
I have a few other controls which I want to add +5 working days and another to i want to be able to +30 working days. However I assume once I have the code I will be able to adjust it.
Thank You
I have a date controls (Date Entered) which is manually entered in Access, however I have another date controls (Date Chased) in which I want this controls to automatically populate with +2 working (Monday - Friday) days from Date Entered. Therefore If the date happens to be a Friday on the Date Entered control , I want Date Chased control to show Mondays date.
I have a few other controls which I want to add +5 working days and another to i want to be able to +30 working days. However I assume once I have the code I will be able to adjust it.
Thank You