Elmobram22
Registered User.
- Local time
- Today, 02:32
- Joined
- Jul 12, 2013
- Messages
- 165
Hi,
I'm just wondering if this would be possible. I have a staff rota system that works on a rolling 4 weekly basis. I am using a table to store the shifts of a person dependent on week. I want to be able to tell access that Monday on week 1 corresponds to a certain date and then get access to figure out the rolling system based on that date.
eg Monday 21/7/13 is week 1 (7 days later it knows it is linked to week 2)
This is so if a staff member is off sick I can say they were off sick on the 24th and it will populate their timesheet with the corresponding shift without me having to input it manually. Doable?
Cheers,
Paul
I'm just wondering if this would be possible. I have a staff rota system that works on a rolling 4 weekly basis. I am using a table to store the shifts of a person dependent on week. I want to be able to tell access that Monday on week 1 corresponds to a certain date and then get access to figure out the rolling system based on that date.
eg Monday 21/7/13 is week 1 (7 days later it knows it is linked to week 2)
This is so if a staff member is off sick I can say they were off sick on the 24th and it will populate their timesheet with the corresponding shift without me having to input it manually. Doable?
Cheers,
Paul