Workaholic
Registered User.
- Local time
- Today, 10:21
- Joined
- Jun 20, 2004
- Messages
- 17
I have designed a query that shows the time taken for an IT job, from when it was opened to when it was completed. The problem is I need the time factor to be a criteria based on working hours, ie Mon-Frid, 8.00 - 18.00.
How can you base a time criteria within these constraints?
How can you base a time criteria within these constraints?