Elmobram22
Registered User.
- Local time
- Today, 21:57
- Joined
- Jul 12, 2013
- Messages
- 165
Hi all,
I have been wondering whether it is possible to do something with a database I have. I make time sheets for staff members at work. I currently use a system of a bunch of word documents with a four week template of their hours on and I create a default word document template for the corresponding month. Each pay month runs from the 23rd of a month to the 22nd of the next. Each staff member works different shifts based on a four week rolling rota. All I currently do is determine the week and day of the 23rd of a month and copy and paste the information across. This works fine but can have human error and can take a fair bit of time.
In the mean time I have built a annual leave calculator which holds the 4 week rota within the database. I was wondering if there was a way to automate these word based time sheets in a report or something similar where I can tell the database what week and day the 23rd was and it would run the default shifts for that month off? maybe I am making this very unclear. If so let me know if you have no idea what I'm on about.
Cheers,
Paul
I have been wondering whether it is possible to do something with a database I have. I make time sheets for staff members at work. I currently use a system of a bunch of word documents with a four week template of their hours on and I create a default word document template for the corresponding month. Each pay month runs from the 23rd of a month to the 22nd of the next. Each staff member works different shifts based on a four week rolling rota. All I currently do is determine the week and day of the 23rd of a month and copy and paste the information across. This works fine but can have human error and can take a fair bit of time.
In the mean time I have built a annual leave calculator which holds the 4 week rota within the database. I was wondering if there was a way to automate these word based time sheets in a report or something similar where I can tell the database what week and day the 23rd was and it would run the default shifts for that month off? maybe I am making this very unclear. If so let me know if you have no idea what I'm on about.
Cheers,
Paul