Recent content by PANKAJINFO1

  1. P

    Date query--Urgent Help

    Can I Hope a Solution from The forum. I am still Hanging. Please Solve
  2. P

    Date query--Urgent Help

    Sorry For The texts But it was urgent
  3. P

    Date query--Urgent Help

    Can Any Body Solve the problem in this forum. Its Urgent
  4. P

    Date query--Urgent Help

    Can Any Body Solve the problem in this forum. Its Urgent
  5. P

    Date query--Urgent Help

    Please check the problem. Its really urgent.
  6. P

    Date query--Urgent Help

    I changed that but still the same problem
  7. P

    Date query--Urgent Help

    please can you solve this. i changed name of the field in inspdate
  8. P

    Date query--Urgent Help

    I replaced group by with Where but still the same i am attaching the package i created. use "date selection" Form PPMquery and run the query please check "Coil Shop" should be grouped but the problem is they are separated because dates are different. What i want "Coil Shop" should in...
  9. P

    Date query--Urgent Help

    I have a problem with the result of a Query. Start Date End Date Query runs after entering unbound pameter text box Start and end date. What i want is i am grouping of Opertaor, sum of defects between the dates. but dates i am not able to group or sum or etc. I want when the start...
  10. P

    converting text dates into date format

    I want to change Text datatype in Date datatype 04.01.2003 (dd.mm.yyyy). Please help
  11. P

    Defect database correction

    like if 10 is the total defects a pop up window of 2 +3+4+1 and description and alos checks the subtotal equals to the total. I
  12. P

    Defect database correction

    I am facing one problem as soon as total defects are entered a pop up of sub form or any thing pops for the calculation of defects
  13. P

    Defect database correction

    Please help its urgen
  14. P

    Defect database correction

    HI all I request you all to correct the data base to record the defect of an operator and supllier wise. if total defects of the day is 10 then it should prompt the subcalculation of all defects selecting operator's as well as supplier's defects and grand total of the defects should be...
  15. P

    converting text dates into date format

    Please provide some example . Thanks
Back
Top Bottom