colinmunnelly
Registered User.
- Local time
- Today, 18:49
- Joined
- Feb 26, 2002
- Messages
- 89
I have a report that lists instructions received together with the days it will take to carry out the work. I need to create a calculated field that simply shows the greatest or highest number of days on the report. Is this possible?