Hi all,
I'm working on a library database for a small collection.
I have two fields, 'Date Out' and 'Date IN'. Is it possible that whatever date is written for the date taken out, I can set the 'Date IN' to be 7 days later than that date?
Thanks in advance.
I'm working on a library database for a small collection.
I have two fields, 'Date Out' and 'Date IN'. Is it possible that whatever date is written for the date taken out, I can set the 'Date IN' to be 7 days later than that date?
Thanks in advance.