I have a tricky problem
I have a series of fields on a form. Date Entered, Deadline and Estimated Time. The Date Entered and the Deadline will both be date inputs by the user. What I want is that when a user inputs these dates the estimated time is then calculated between the two dates.
So how do I calculate the estimated time between dates eg 20/11/02 and 26/01/03?
If this is possible, with the solution what difference would it make if the date was then say 20/11/2002 and 26/01/2003
Thanks for any help
I have a series of fields on a form. Date Entered, Deadline and Estimated Time. The Date Entered and the Deadline will both be date inputs by the user. What I want is that when a user inputs these dates the estimated time is then calculated between the two dates.
So how do I calculate the estimated time between dates eg 20/11/02 and 26/01/03?
If this is possible, with the solution what difference would it make if the date was then say 20/11/2002 and 26/01/2003
Thanks for any help