Hullo folks,
I have a call times log set up.
TimeIn, TimeOut, Duration.
I want to set up a graph that looks like this:
X-Axis = TimeIn per hour
Y-Axis = Count of Calls (TimeIn will suffice) per hour
This is the first time I've seen Graph in Access, and I'm rather lost.
Thanks.
I have a call times log set up.
TimeIn, TimeOut, Duration.
I want to set up a graph that looks like this:
X-Axis = TimeIn per hour
Y-Axis = Count of Calls (TimeIn will suffice) per hour
This is the first time I've seen Graph in Access, and I'm rather lost.
Thanks.