Hi,
1. I have to make a series of graphics, will I be better off making them in a form or in a report?
2. And by the way, since it concerns about 30 graphics and they will all look alike (same exes, same type of graphic), is there a quicker way than to do them one after the other?
Thanks
1. I have to make a series of graphics, will I be better off making them in a form or in a report?
2. And by the way, since it concerns about 30 graphics and they will all look alike (same exes, same type of graphic), is there a quicker way than to do them one after the other?
Thanks