stuart_adair
Registered User.
- Local time
- Today, 04:18
- Joined
- Jan 13, 2009
- Messages
- 57
Hi,
I have a database with fields called:
Date Raised (Date which defaults to todays date)
Target Closure Date (Date calculated)
Priority_2 (Tick box)
Currently the Target Closure Date is automatically calculated by an entry in the default value on the form which reads [Date Raised] +5 and this works fine.
I've been asked to add a formula in so if Priority_2 is ticked then the Target Closure Date = Date Raised +1 day. If Priority_2 is not ticked then the Target Closure Date = Date Raised + 5 days.
I'm struggling with this; my Access experience isn't brilliant so please be gentle with me
Stu
I have a database with fields called:
Date Raised (Date which defaults to todays date)
Target Closure Date (Date calculated)
Priority_2 (Tick box)
Currently the Target Closure Date is automatically calculated by an entry in the default value on the form which reads [Date Raised] +5 and this works fine.
I've been asked to add a formula in so if Priority_2 is ticked then the Target Closure Date = Date Raised +1 day. If Priority_2 is not ticked then the Target Closure Date = Date Raised + 5 days.
I'm struggling with this; my Access experience isn't brilliant so please be gentle with me
Stu