mancmark80
New member
- Local time
- Today, 12:25
- Joined
- Jan 5, 2015
- Messages
- 2
Hi,
I have linked an Access 2007 Database to Outlook 2007 and it has automatically pulled through a number of fields.
One field it hasn't pulled through that is critical to the databases function is 'Flag Completed Date'. This is because I want to measure the number of hours between 'Received' (Date and time) and this missing field.
Does anyone know how i can pull this through as I have tried everything i can think of?
One thing to note is that Outlook is hosted on an exchange server.
thanks
I have linked an Access 2007 Database to Outlook 2007 and it has automatically pulled through a number of fields.
One field it hasn't pulled through that is critical to the databases function is 'Flag Completed Date'. This is because I want to measure the number of hours between 'Received' (Date and time) and this missing field.
Does anyone know how i can pull this through as I have tried everything i can think of?
One thing to note is that Outlook is hosted on an exchange server.
thanks