I have a table that is overwritten every month, but want to keep a copy of the old table (in the BE) for audit.
How can I control the BE from the FE and is it possible to create a link to the new table in code?
Hope someone can help!
How can I control the BE from the FE and is it possible to create a link to the new table in code?
Hope someone can help!