I hope I can explain this clearly.....just need a little help on this.
We have a input form that writes a date to a table for each day that a truck driver turns in his paperwork (actually a "drivers log" for those familiar with trucking). What I want to do is make a report based on the dates that the paperwork IS NOT turned in. How can I compare the data that I have in the table with a "calendar" and show what days are missing?
Thanks!
Peter
We have a input form that writes a date to a table for each day that a truck driver turns in his paperwork (actually a "drivers log" for those familiar with trucking). What I want to do is make a report based on the dates that the paperwork IS NOT turned in. How can I compare the data that I have in the table with a "calendar" and show what days are missing?
Thanks!
Peter