You folks have been great help in the past,,,,,, wondering if someone can help me with this one...
starting from scratch..... I need to count down and do some math
I need something that will count down days as the day pass'es, basically if i start with a number and as the days pass the number decreases (it isnt a basic 365 day calendar) on top of that i have a defined number of X's that need to be done per day. i can do an average for number of X's to complete per day ,,,,, but it needs to be adjustable..... like:
i start on a monday with 84 days and i have a 106 X's to complete in those 84 days, simple math says i need to do approximatily 1.3 days to compete X's in 84 days....
but come tuesday i will only have 83 days to compele the number of X's i have left.
I am thinking i need some sort of an initial input to start the calculations. then someway of editing it based on how many x's i get a day,,,,then i need the day to pass.
I have tried this in excel but it required basically redoing the formulas every day to adjust to for the differences.
this is a question to see if it could be "automated" in access and if it could,,,, can anyone help me with it,,,,,
thanks folks
Jake
starting from scratch..... I need to count down and do some math
I need something that will count down days as the day pass'es, basically if i start with a number and as the days pass the number decreases (it isnt a basic 365 day calendar) on top of that i have a defined number of X's that need to be done per day. i can do an average for number of X's to complete per day ,,,,, but it needs to be adjustable..... like:
i start on a monday with 84 days and i have a 106 X's to complete in those 84 days, simple math says i need to do approximatily 1.3 days to compete X's in 84 days....
but come tuesday i will only have 83 days to compele the number of X's i have left.
I am thinking i need some sort of an initial input to start the calculations. then someway of editing it based on how many x's i get a day,,,,then i need the day to pass.
I have tried this in excel but it required basically redoing the formulas every day to adjust to for the differences.
this is a question to see if it could be "automated" in access and if it could,,,, can anyone help me with it,,,,,
thanks folks
Jake