Hello all,
I'm very new to access, but see it has potential for a big payoff for a project I am doing. Currently, I'm stuck summing across the columns for Step 1 EC (est completion) - Step 8 EC. This may be a poor design on my part from inputting the data in the table. But all of these jobs being a stochastic process with always different steps in machining, I don't know how else to do it.
With all that being said, I would like each Piece Part to have a sum of days at the bottom of estimated completion and actual completion. Again, it must show the total for EACH part.
For example, as shown in the access file in report under "Piece Parts Report" the first part (No. 2 Aluminum Base Plate), it goes through 3 steps... with the steps being 1, 5, and 5 days respectively. I'd like for it to show at the bottom a total of 11 days for that part to be manufactured.
Can someone please help me get to a solution.
Thanks in advance!
I'm very new to access, but see it has potential for a big payoff for a project I am doing. Currently, I'm stuck summing across the columns for Step 1 EC (est completion) - Step 8 EC. This may be a poor design on my part from inputting the data in the table. But all of these jobs being a stochastic process with always different steps in machining, I don't know how else to do it.
With all that being said, I would like each Piece Part to have a sum of days at the bottom of estimated completion and actual completion. Again, it must show the total for EACH part.
For example, as shown in the access file in report under "Piece Parts Report" the first part (No. 2 Aluminum Base Plate), it goes through 3 steps... with the steps being 1, 5, and 5 days respectively. I'd like for it to show at the bottom a total of 11 days for that part to be manufactured.
Can someone please help me get to a solution.
Thanks in advance!