Thats a large subject line!!
Anyway
I want to work out the difference between two times, both of which are date/time fields and then multiply this by a rate, i have tried this
Hours/Mins*24*rate
this works only if the hours/mins is of a whole number.
if i have a figure of 9.35 hours/mins - i recieve a incorrect figure.
can any body help??
thanks
sushil
Anyway
I want to work out the difference between two times, both of which are date/time fields and then multiply this by a rate, i have tried this
Hours/Mins*24*rate
this works only if the hours/mins is of a whole number.
if i have a figure of 9.35 hours/mins - i recieve a incorrect figure.
can any body help??
thanks
sushil