Evening,
Having a spot of bother with some date calculations. I have two date options (Date_down and Date_returned) for kit that goes away for repair. Not that it probably matters, but these dates are contained in a sub-form for each item of kit (one kit can have many faults).
To keep a track on how reliable the piece of kit is, i would like to work out the days in between, and have this value stored in a field (Daysdown) preferably.
To now, the days have just been shown in a unbound text box using
Any suggestions?
Having a spot of bother with some date calculations. I have two date options (Date_down and Date_returned) for kit that goes away for repair. Not that it probably matters, but these dates are contained in a sub-form for each item of kit (one kit can have many faults).
To keep a track on how reliable the piece of kit is, i would like to work out the days in between, and have this value stored in a field (Daysdown) preferably.
To now, the days have just been shown in a unbound text box using
Code:
=DateDiff("d",[Date_down],[Date_returned])