Blackwidow
Registered User.
- Local time
- Today, 03:11
- Joined
- Apr 30, 2003
- Messages
- 149
Dat problem...
Much to my annoyance... the Head Secretary has now decided that having 9 September 2003 as a date is not good enough and she now wants 9th September 2003 etc.... ie.. all the st, rd, th's..
the only way I have found to do this is through a query.. where basically I tell it Date 1: IIf([Date 4]=22,"nd",IIf([Date 4]=1,"st",IIf([Date 4]=21,"st",IIf([Date 4]=31,"st",IIf([Date 4]=2,"nd",IIf([Date 4]=3,"rd",IIf([Date 4]=23,"rd","th")))))))
please someone tell me there is an easier way caus I have about five different dates to set this way.... and the query takes an age to run now...
Much to my annoyance... the Head Secretary has now decided that having 9 September 2003 as a date is not good enough and she now wants 9th September 2003 etc.... ie.. all the st, rd, th's..
the only way I have found to do this is through a query.. where basically I tell it Date 1: IIf([Date 4]=22,"nd",IIf([Date 4]=1,"st",IIf([Date 4]=21,"st",IIf([Date 4]=31,"st",IIf([Date 4]=2,"nd",IIf([Date 4]=3,"rd",IIf([Date 4]=23,"rd","th")))))))
please someone tell me there is an easier way caus I have about five different dates to set this way.... and the query takes an age to run now...