Hello
have a table with the following: Destinations, sent date , return date
date in the table looks like this
London 11/12/04 11/14/04
London 15/12/04 18/12/04
Geneva 14/12/04 16/12/04
I need to calculate the average time it takes for destination to reach minus the weekends. Sat and Sun are not to be included in the caluculations.
Thanks in advance
Cheers
have a table with the following: Destinations, sent date , return date
date in the table looks like this
London 11/12/04 11/14/04
London 15/12/04 18/12/04
Geneva 14/12/04 16/12/04
I need to calculate the average time it takes for destination to reach minus the weekends. Sat and Sun are not to be included in the caluculations.
Thanks in advance
Cheers