Hello,
I have created a table containing jobs that need to be done from my team (IT production). Each time someone start or finishes a job, he must fill a box that updates a specific row in the table. I want to log the time of that action.
Any ideas of how I could set this up in Access? I have tried the Now() function in the Default Value of the field End Time, but this is updated everytime I refresh the table
I have created a table containing jobs that need to be done from my team (IT production). Each time someone start or finishes a job, he must fill a box that updates a specific row in the table. I want to log the time of that action.
Any ideas of how I could set this up in Access? I have tried the Now() function in the Default Value of the field End Time, but this is updated everytime I refresh the table