I've two dates/times in mm/dd/yyy hh:mm format.
TimeA: 2/7/2003 2:00am
TimeB: 2/8/2003 4:00am
I have field (date field) and do a simple TimeB - TimeA, the result is 2:00 which is wrong as the second date/time is over a day already.
Any suggestion what I should do? Thanks....
TimeA: 2/7/2003 2:00am
TimeB: 2/8/2003 4:00am
I have field (date field) and do a simple TimeB - TimeA, the result is 2:00 which is wrong as the second date/time is over a day already.
Any suggestion what I should do? Thanks....