I have a form on which I log the realease and return of hired out tools. I have an ActiveX calendar on the form to enable me to enter the ReleaseDate but I would like to use the same calendar to enter the ReturnDate but at present the Control Source for the calendar is only the ReleaseDate. Is there any way in which the calendar can be used to provide dates for both fields or do I have to have two calendars?
Also can you insert an activeX calendar on a tab control - I seem to have trouble doing this.
Many thanks in advance.
[This message has been edited by Robert C (edited 05-22-2000).]
Also can you insert an activeX calendar on a tab control - I seem to have trouble doing this.
Many thanks in advance.
[This message has been edited by Robert C (edited 05-22-2000).]