Laura Sunny
New member
- Local time
- Today, 07:39
- Joined
- Mar 26, 2022
- Messages
- 6
Hello Experts,
My name is Laura, I'm fairly new to access; having totally overlooked it as an application till now.
I think I have the jist of the most basic elements of Access but I'm struggling to understand how to structure a table and/ or make a form for the following requirements:
Every Friday, we record (currently in excel) which site a subcontractor has worked at on different days, then add up the days they were in and pay them accordingly.
I'd like to be able to have a form open up pre-populated with the week commencing date and then in a sort of tabular: Monday, Tuesday, Wednesday.... as columns, with rows pre-populated with subcontractors names. Then drop downs under each day with Sites, so that the foreman can easily complete this weeks diary.
It doesn't have to be exactly this way, it needs to be in as few clicks as possible or I'll end up with them doing the usual of drawing a grid on a piece of paper and sending me a picture of the "diary"
.
I have a Site table, a Subcontractor table, a Diary table. I have set the Diary table up to record one day , per subcontractor as a single record as I thought this was the most flat way to do it. I could combine days of the week or subcontractors into each row but I think that will cause problems down the road.
In case more context is helpful, this is intended to calculate wages but also days spent on different sites for invoicing etc, we are a small building company.
I hope that makes sense and thank you very much for any help.
Laura
My name is Laura, I'm fairly new to access; having totally overlooked it as an application till now.
I think I have the jist of the most basic elements of Access but I'm struggling to understand how to structure a table and/ or make a form for the following requirements:
Every Friday, we record (currently in excel) which site a subcontractor has worked at on different days, then add up the days they were in and pay them accordingly.
I'd like to be able to have a form open up pre-populated with the week commencing date and then in a sort of tabular: Monday, Tuesday, Wednesday.... as columns, with rows pre-populated with subcontractors names. Then drop downs under each day with Sites, so that the foreman can easily complete this weeks diary.
It doesn't have to be exactly this way, it needs to be in as few clicks as possible or I'll end up with them doing the usual of drawing a grid on a piece of paper and sending me a picture of the "diary"

I have a Site table, a Subcontractor table, a Diary table. I have set the Diary table up to record one day , per subcontractor as a single record as I thought this was the most flat way to do it. I could combine days of the week or subcontractors into each row but I think that will cause problems down the road.
In case more context is helpful, this is intended to calculate wages but also days spent on different sites for invoicing etc, we are a small building company.
I hope that makes sense and thank you very much for any help.
Laura