I have a database which records time spent on various projects and I would like to be able to calculate the time spent on any particular project between two selected dates. The report and the query behind it already works to display the time accrued on all the dates of a project, but I want to be able to break it down to small ranges of dates
I have a form on which the user selects the start date and the end date. How can I apply this calculated information as a criteria in a query so that I can produce a report with the relevant information on it.
I already have the report and the date selection form designed. The dates selected go into two unbound fields which have a date format.
I hope someone can help me.
Rob
I have a form on which the user selects the start date and the end date. How can I apply this calculated information as a criteria in a query so that I can produce a report with the relevant information on it.
I already have the report and the date selection form designed. The dates selected go into two unbound fields which have a date format.
I hope someone can help me.
Rob