Hi All,
I have a huge amount of data in a subform and i am trying to speed up how quickly the data is loaded when i open the form.
Any suggestions to speed it up would be great, maybe there is nothing i can do but worth a try.
All the data is pulled from a table but there are two formula fields that i have added to the subform which are below.
Open/Closed
AND
Length (working days) which is color co-ordinated by values (conditional formatting).
I have a huge amount of data in a subform and i am trying to speed up how quickly the data is loaded when i open the form.
Any suggestions to speed it up would be great, maybe there is nothing i can do but worth a try.
All the data is pulled from a table but there are two formula fields that i have added to the subform which are below.
Open/Closed
Code:
IIf(IsNull([Date Closed]),"Open",IIf([Date Closed]<=Date(),"Closed","Open"))
AND
Length (working days) which is color co-ordinated by values (conditional formatting).
Code:
IIf(IsNull([Date Closed]),weekdays([Case Start Date],Date()),weekdays([Case Start Date],[Date Closed]))
Code:
Public Function Weekdays(ByRef startDate As Date, ByRef endDate As Date) As Integer
' Returns the number of weekdays in the period from startDate
' to endDate inclusive. Returns -1 if an error occurs.
' If your weekend days do not include Saturday and Sunday and
' do not total two per week in number, this function will
' require modification.
' The number of days inclusive.
Dim varDays As Variant
' The number of weekend days.
Dim varWeekendDays As Variant
' Temporary storage for datetime.
Dim dtmX As Date
On Error GoTo Weekdays_Error
' The number of weekend days per week.
Const ncNumberOfWeekendDays As Integer = 2
' If the end date is earlier, swap the dates.
If endDate < startDate Then
dtmX = startDate
startDate = endDate
endDate = dtmX
End If
' Calculate the number of days inclusive (+ 1 is to add back startDate).
varDays = DateDiff(Interval:="d", _
date1:=startDate, _
date2:=endDate) + 1
' Calculate the number of weekend days.
varWeekendDays = (DateDiff(Interval:="ww", _
date1:=startDate, _
date2:=endDate) _
* ncNumberOfWeekendDays) _
+ IIf(DatePart(Interval:="w", _
Date:=startDate) = vbSunday, 1, 0) _
+ IIf(DatePart(Interval:="w", _
Date:=endDate) = vbSaturday, 1, 0)
' Calculate the number of weekdays.
Weekdays = (varDays - varWeekendDays)
Weekdays_Exit:
Exit Function
Weekdays_Error:
Weekdays = -1
MsgBox "Error " & Err.Number & ": " & Err.Description, _
vbCritical, "Weekdays"
Resume Weekdays_Exit
End Function